Some apps are distributed as Split APKs (multiple .apk files packaged together) to optimize resources. Standard Android installers cannot open them.
- Unity security updated.
Come rescue the girls trapped in various cruel traps within a sinister mansion.
Rescuing everyone won't just be challenging—it may push you to your limits.
Can you uncover the truth hidden among the five different endings?
Please note: this game contains grotesque and disturbing content.
Well it was a good experience. The puzzles are awesome it took me couple of tries and restarts before i finally was able to reach an ending, and there was some point i got stuck in but i was able to surpass it, but the story i really didn't get it in ending E but other than that a good game and fun that requires a lot of thinking inside the box and outside the box, so yeah i recommend it.
Difficult & gruesome. It really makes me feel sorry for those pixelated little girls & on the other hand see if I can discover all the possible deaths 🙈 Difficulty is high, and several rounds are needed to discover the logic behind mechanisms. Fortunately, the game has save & load functions. It's nice that the game had a time factor measured in steps. Think all your want, but you might be limited by number of moves ⏳
I really enjoyed running around solving all the puzzles, some were too hard for me, but I liked that too. I got almost to the end, then realized I had to mutilate some of the girls to save everyone. It really killed my interest in playing, it kind of defeated the point for me. If its impossible to avoid then there arent really any stakes anymore. I felt pretty disappointed after all my effort and didnt bother completing the game. The poor girls are very sweet, I give them all hugs with my heart
Excellent game. The puzzles are really intriguing and surprising. Although dark, the game captures a unique sense of mystery that kept me hooked from start to finish, something I did not expect from such a small game. The devs did a great job. Worth playing.
com.yotalien.yabatanien on the APK Downloader.Yes! Every APK download provided by APKDER undergoes rigorous security verification. We verify that the cryptographic signature of the APK file matches the official signature from the developer, ensuring the APK is original, untouched, and free from any modifications.
To install it, you first need to enable "Unknown Sources" in your Android device's security settings. After downloading the APK file from APKDER, tap it to begin the installation and follow the on-screen prompts.
Yes! As soon as the developer releases a new version of Trapped Girls, we will update and provide the updated APK on APKDER. You can simply download and install the new APK over the existing installation without losing your app data.
Yes. APKDER allows you to bypass geographic restrictions and download official APK files directly, even if the app or game is not officially available in your country's store.
A standard APK is a single installation package. An XAPK or Split APK contains multiple resource files (like OBB expansions or device-specific layout parts) packaged together. To install them, you can download splits individually or use dynamic helper tools like Split APKs Installer (SAI).
This APK download is 100% safe. We verify that the cryptographic signature of the file matches the official developer credentials. No modifications or adware are injected.